A direct load management plan with two-way conversation while considering conclude customers comfort is proposed. 1st, the Manage algorithm is made and the data needed to be transmitted between process operator and controllable loads is determined.A lot of offshore wind farms and interconnectors are anticipated to become constructed in the North Se